Who should sign off AS400 facilities readiness before a cutover?

The people who own the room and workload should sign off before the cutover.

Answer

The people who own the room and workload should sign off before the cutover.

  • IT
  • Facilities or data center staff
  • Installer or reseller
  • Workload owner
  • Rack
  • Power
  • UPS
  • PDU
  • Cooling
  • Cabling
  • HMC
  • Console
  • Service-clearance plan

The sign-off should use the final configured system, not a generic model estimate. If the configuration changes after review, repeat the facilities check.